RioSol Transmission Project
RioSol Transmission Project Details

| Project Scope |
|
| Capacity |
|
| Investment |
|
| Economic Benefit |
|
About the RioSol Transmission Project
RioSol is a high-voltage alternating-current (HVAC) transmission line rated at a capacity of 1,500 MW that runs parallel to SunZia, another RETA project that is the largest renewable energy development project in the western hemisphere. Under development since 2008, it was originally part of the SunZia transmission line project. This second line of SunZia was renamed RioSol after Pattern Energy Group LP purchased the first line of SunZia from SouthWestern Power Group in 2022.
RETA is co-developing this project with SouthWestern Power Group. Based on completion of SunZia, RioSol’s construction will commence in 2026 and will be in service by 2028. The projected in-service date provides New Mexico and Arizona communities the opportunity to tap into wind and solar power ahead of the renewable energy portfolio standard requirements that go into effect in 2040.
RioSol is currently finalizing its interconnection plan, which includes numerous interconnection points in New Mexico. These interconnection opportunities would provide regional reliability and resiliency to the grid and potentially make New Mexico wind power available to New Mexico utilities.